Hospital Stainless Hand wash Sink
Washing sink is widely used in operating rooms, sterile rooms, laboratories, and other high-health requirements. The pool surface is upgraded to rounded corners, endless connection, is more convenient to clean.
name |
size |
Material |
Single wash sink |
800*600*1200 |
1.0+1.2 304 stainless steel |
Three-person sink |
1800*600*1200 |
1.0+1.2 304 stainless steel |
Single wash sink
(Double Edition) |
800water600:1800 |
1.0+1.2 304 stainless steel |
double sink
(Double Edition) |
1500*600*1800 |
1 .0+1.2 304 stainless steel |
Three-person sink(Deluxe Edition) |
1800*600*1800 |
1.0+1.2 304 stainless stee |
single person sewage basin |
600water600+950 |
1.0+1.2 304 stainless steel |
double person sewage basin |
1200*600+950 |
1.0+1.2 304 stainless steel |
Three-person sewage basin |
1500*600*950 |
1.0+1.2 304 stainless steel |
Stainless steel wash sink
1. Material: The tank is 1.2 SUS304 stainless steel, and the other parts are 1.0 SUS304. SS316 can also be customized.
2. Water outlet mode: pedal, knee touch, manual, automatic induction.
3. Optional configurations: water heater, sterilizer, dryer, filter.
Stainless steel Mop Pull
1. Material:The tank is 1.2 SUS304 stainless steel, and the other parts are 1.0 SUS304. SS316 can also be customized.
2.Modeling: simple atmosphere, pool body and door panels have strengthened treatment, thick and durable.
3. Bottom structure: drain line, drainage thoroughly, not easy to hide dirt, prevent bacteria breeding.
4. Optional configurations: water heater, sterilizer, dryer, filter.





Q:Where have you exported your equipment?
A:We've already exported to more than 30 countries in Aisa,Europe,Middle East,Africa,South America.etc.
Q:Can you arrange the visit to your user?Can you customized the machine according to our requirements?
A:Yes,Of course!
Q:Is your equipment in accordance with GMP,WHO?
A:Yes,we will design and manufacture the equipment according to the requirement of GMP/WHO in your company.
Q:How about your after sale service?
A:We will reply you within 24hours by email or phone.
Q:How about the staff training?
A:Normally,we will train your staffs during the installation in your site,you are also welcome to send your staff train in our
factory.
Q:How long will the turnkey project take?
A: Depends on the project. The longest time will about 1 year from designing the layout to finish installation and commissioning.
Q:Which kind of after-sales service you can offer?
A:Except the regular service ,we can also provide you know-how transfer,and dispatch our qualified engineers to help you run the factory up to 6-12 months.